Advertisement

Our Times 3

Dr. Brian L. Horejsi

  • The Keystone XL Pipeline: Part II

    Promises of great wealth and vast public benefits generously spread through the streets and into the domiciles of each and every resident are standard for the oil and gas industry when it is trying to wedge a massive new project, like the Keystone XL Pipeline, into the political and physical landscape.

  • The Keystone XL Pipeline: Part I

    Some time in the very near future–perhaps as early as this fall–President Obama and administration insiders will approve the construction of the massive Keystone XL pipeline. With the stroke of that pen the gates will open to the flow of about 700,000 barrels of the most costly and toxic oil on earth from below the no longer quiet boreal forests of Alberta to Oklahoma and the Gulf of Mexico.

Browse the Archive